Ohio Turnpike going East or West:
Take 80/90 to exit 64. Then take 75 South about 1 mile to exit 193 (Fremont Pike/Route20). Go left off exit onto Route20/Fremont Pike. We are on the left side (North
View More
Ohio Turnpike going East or West:
Take 80/90 to exit 64. Then take 75 South about 1 mile to exit 193 (Fremont Pike/Route20). Go left off exit onto Route20/Fremont Pike. We are on the left side (North).
I-75 going North or South:
Take I-75 to exit 193. From 75N you are going to make a right off of exit and we are down about half mile on left side.
From 75S you are going to go left off exit and we are 2 lights down and left side.
23 South from Michigan:
23S will become 475 West. It will dead end into I-75 and take that going North to exit 193. Right at stop light and we are on left side.
From Detroit Metro Airport:
Take 94 West to 275 South to 75 South. Stay on 75 South through Toledo. Take exit 193 and go left at light and we are on left side.
23 North from Columbus:
Follow 23N, which will turn into 75N just before Findlay. Stay on 75N through Findlay and Bowling Green..take to exit 193. Turn right off exit and we are on the left side.
View Less